Infrastructure Concessions “Rodovia Transcerrados”, Highway PI 397: Demand, Engineering, Social/Environmental, Financial Assessment, and Legal Modeling Studies 01
Urban Development Studies of Urban Planning and of the Impact on the Area’s Circulation and Traffic of the Construction of Belo-Horizonte’s New Bus Terminal 02
Logistic Chain Optimization Production Unit and DC Location in Brazil for a Major Cosmetics Maker, and Inbound and Outbound Logistics Optimization 03
Urban Development Projection of Traffic Demand and Design of a Road System for the Caieiras Development 04